Restaurant equipment buying checklist: specs, site readiness, insurance, and install week

A kitchen install is a sequence of handoffs among the dealer, the mechanical contractor, the landlord, the inspector, and the insurer. A late handoff at any point leaves a delivery sitting on a loading dock. This list follows the order in which a restaurant usually works, from quotes to the first dinner service. Fire protection and refrigerant references are linked under Sources so each check ties back to a published standard.

At a glance

Checklist at a glance (illustrative)
ItemPlanning note
Deal range$10,000 to $1,000,000+, from one unit to a multi-site build
Illustrative termsConfirm 24 to 84 months against average weekly sales
Down paymentHold funds for 10% to 20% plus freight and rigging (estimate)
DocumentsModel and serial list, utility specs, landlord letter, binder, sales statements
Inquiry stepNo credit check to inquire. Credit from 500 to 800+ FICO is considered when you pursue funding.

Before signing with a dealer or consultant

Ask for a quote that lists every piece by manufacturer and model number. A package labeled only as a line with a lump price cannot be matched against drawings or inspection notes.

Confirm warranty terms and who services the equipment after startup. Some manufacturers require authorized installers for the warranty to remain valid.

  • Collect model numbers, voltage, gas size, and water needs for each piece
  • Ask what is included for freight, rigging, and startup visits
  • Request references from kitchens of similar size
  • Compare delivery lead times with the planned inspection date
  • Confirm return and restocking terms for special orders

Landlord, franchise, and insurance coordination

A lease for the space often limits what can be attached to walls, roofs, or utility lines. Written landlord approval for the hood, rooftop fan, and any gas line work should be in hand before ordering.

Franchise concepts may require specific equipment brands or models. A mismatch with the franchisor's spec can cost weeks, so the approved list should be checked against the quote before a deposit is paid.

Estimate only: who signs off on each install item
ItemWho approvesRecord to keep
Hood and suppressionFire marshal and licensed contractorPermit and acceptance test report
Gas and electricalLicensed mechanical or electrical contractorPermit and inspection card
RefrigerationRefrigeration technicianStartup report and refrigerant log
Plumbing and grease controlPlumber and local utilityPermit and approval letter

Preparing the funding file

A typical file includes the vendor quote, the lease summary for the space, three months of bank or sales statements for existing locations, and the insurance binder. New concepts may add a short business plan and a personal financial summary.

A brief note that explains seasonality or an unusual month saves a reviewer from guessing. Restaurants near campuses, resorts, or stadiums can look uneven without that context.

  • Vendor quote with model numbers and installation scope
  • Insurance binder listing the equipment and the lienholder
  • Lease summary showing term, rent, and landlord consent
  • Bank or point-of-sale statements for the last three months

Delivery, rigging, and inspection week

Confirm that doors, hallways, and elevators can handle the largest pieces. A walk-in panel or a hood section that cannot turn a corner has to be redesigned or lifted in by crane.

Schedule the fire suppression acceptance test and the health inspection around the install, not after it. Many jurisdictions will not issue an operating permit until both are complete.

Training, startup, and the soft opening

Schedule manufacturer startup visits before the first staff training session. A technician who calibrates the combi oven and the dish machine while the crew watches prevents weeks of avoidable service calls.

A soft opening is a useful dress rehearsal for the whole kitchen. Running a limited menu for a few days exposes ventilation, drain, and cooler problems while the dealer is still on the project and the warranty clock has barely started.

After opening: keeping equipment insurable

Keep service contracts, cleaning logs, and suppression inspection tags current. Insurers and lenders both ask for them after a claim.

Review the payment against actual sales after the first quarter. A concept running ahead of plan can consider prepaying, and a slower one can talk through options before a payment is late.